Skandi Acergy Project History:

Project History from 2008 to 2015.

This summary of Skandi Acergy Project History from commencement of operations in August 2008 through to September 2015 essentially covers my work history for the same period.

In all Projects I was involved in either pre-job planning in the months leading up to the offshore phase, or the offshore operations, and in most cases - both.


ACV06 being lifted 'off deck' and ready for launch. The hatches over the Moon Pool can now be opened and the ROV, TMS and Latch Beam lowered into the water; guided through the Moon Pool inside the Cursor Frame.

October 2008.

ACV06 again, but this time showing the TMS lowered out of the Latch Beam and down to deck for maintenance, with the ROV moved away inboard on the ROV Hangar Skidding System.

August 2009.

Roger Brill-Edwards at the controls. Right hand side of ACV06 Dual Operator Control Station.

January 2015 Bayu Undan Project in Timor Sea.